REPORT (PDF)
|
SIZE
|
| Fortescue Solomon Project - Public Environmental Review - November 2010 |
9 mb |
| |
|
| FIGURES
(PDF) |
|
|
|
APPENDICES (PDF)
|
SIZE
|
| Appendix 1 Solomon Regional Assessment Vol 1 |
39 mb |
| Appendix 2 Solomon Kings Area Vertebrate Fauna Assessment |
8.7 mb |
| Appendix 3 Solomon Firetail SRE Invertebrate Habitat Assessment |
2.4 mb |
| Appendix 4 Solomon Visual Impact Assessment |
14 mb |
| Appendix 5 Baseline Noise Monitoring Report Solomon
Project |
0.6 mb |
| Appendix 6 Solomon Baseline Air Quality Report |
1.8 mb |
| Appendix 7 Solomon Flora & Vegetation Assessment |
71.9 mb |
| Appendix 8 Firetail Flora & Vegetation Assessment |
21.1 mb |
| Appendix 9 Solomon Terrestrial Vertebrate Fauna
Assessment |
10.9 mb |
| Appendix 10 Vertebrate Fauna and Fauna Habitat Assessment for the
Firetail Project |
7.8 mb |
| Appendix 11 Firetail Troglofauna Assessment |
3.5 mb |
| Appendix 12 Kings Flora and Vegetation Assessment |
25.7 mb |
| Appendix 13 Kings Subterranean Fauna Assessment |
4.3 mb |
| Appendix 14 Kings Short Range Endemic Assessment |
14.1 mb |
| Appendix 15 Preliminary Hydrological Investigation Bridge Waterway
Investigation |
8.5 mb |
| Appendix 16 Flora & Vegetation Assessment Solomon Rail Vol
1 |
38.8 mb |
| Appendix 17 Solomon Rail Re-Alignment Flora & Vegetation
Assessment |
3.7 mb |
| Appendix 18 Solomon Rail Camp 1G Flora & Vegetation Assessment |
1.6 mb |
| Appendix 19 Level 1 Vertebrate Fauna Assessment Solomon
Rail |
85.3 mb |
| Appendix 20 Solomon Rail Camps 1, 2 & 3 Fauna
Assessment |
5 mb |
| Appendix 21 Solomon Rail Re-Alignment Fauna Assessment |
3.4 mb |
| Appendix 22 An Assessment Impact of Rail Component on Subterranean
Fauna |
3.3 mb |
| Appendix 23 Stage 1 Firetail Waste Characterisation |
1.2 mb |
| Appendix 24 Stage 1 Kings Waste Characterisation |
0.7 mb |
| Appendix 25 Solomon Project Landform Geology Assessment |
23.5 mb |
| Appendix 26 Kings Geochemical Characterisation of Mine Waste Stage
2 Report |
1.1 mb |
| Appendix 27 Firetail Geochemical Characterisation of Mine Waste
Stage 2 Report |
1.3 mb |
| Appendix 28 Solomon Project Stage Two Noise and Vibration
Assessment |
1.8 mb |
| Appendix 29 Solomon Project Air Quality Impact Assessment |
13 mb |
| Appendix 30 Solomon Project Airstrip Flora and Vegetation
Assessment |
4.7 mb |
| Appendix 31 Solomon Rail Preliminary Scoping Study of Groundwater
Development for Construction Water Supply |
1.2 mb |
| Appendix 32 Project Status Report Solomon Project Hydrogeological
Investigation |
5.4 mb |
| Appendix 33 Solomon Project - Concept Mine Closure,
Decommissioning and Rehabilitation Strategy |
2.8 mb |